On-site scaffolding has brought a lot of convenience to the construction. It is generally used in the decoration of external walls or interiors or in places with higher floors that cannot be directly ...
The building formwork used for construction of cast-in-place concrete structure is mainly composed of three parts: panel, supporting structure and connecting parts. The panel is a bearing plate that d...
1.Before stripping aluminium formwork, The general contractor should sign on the approval form for early dismantling of aluminum formwork.2.Dismantle the hanging formwork and all the iron boxes, such ...
(1) It is best to perform a pressure test for assembled table form units.(2) After the platform mold is in place, a guardrail should be set on the outside of the platform mold. The height can be deter...