Tecon-Form Plastic Board offers smooth concrete surface and the most cost-saving solution for any shuttering activities, especially when you calculate the average cost into per time use. They can be applied to all wall, column and slab shuttering projects.
New generation, the most economic shuttering solution, longer service life with lower cost per use
Good and ideal replacement of conventional film faced plywood
Better concrete finish than the regular marine board, no release agent required
Recyclable and environmental friendly, can be used in both tropical or cold area during concreting
Versatile use in formwork system in both girder system and framed system
Up to 50 times use
Sizes: 1220×2440×12/15/18/21 mm
Similar weights compared with conventional plywood
Customized sizes for panel formwork use: 1500×2700/3000 mm etc..
Thickness tolerance: +/- 0.5 mm based on clients' requirement
Other specification including load bearing capacity data are available
Different shuttering projects using formwork girders or formwork frames etc..
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.