TECON-Form Plastic Board

SHARE:

Tecon-Form Plastic Board offers smooth concrete surface and the most cost-saving solution for any shuttering activities, especially when you calculate the average cost into per time use. They can be applied to all wall, column and slab shuttering projects.

Features of TECON-Form Plastic Board

  • New generation, the most economic shuttering solution, longer service life with lower cost per use

  • Good and ideal replacement of conventional film faced plywood

  • Better concrete finish than the regular marine board, no release agent required

  • Recyclable and environmental friendly, can be used in both tropical or cold area during concreting

  • Versatile use in formwork system in both girder system and framed system



Specification of TECON-Form Plastic Board/Shuttering panels

  • Up to 50 times use

  • Sizes: 1220×2440×12/15/18/21 mm

  • Similar weights compared with conventional plywood

  • Customized sizes for panel formwork use: 1500×2700/3000 mm etc..

  • Thickness tolerance: +/- 0.5 mm based on clients' requirement

  • Other specification including load bearing capacity data are available



Application of TECON-Form Plastic Board

Different shuttering projects using formwork girders or formwork frames etc..


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.