TECON Multi-purpose Aluminum Prop TMP series is made from aluminum alloy with high bearing capacity. It is designed with five different heights with built in height indication tape. TECON TMP prop is suitable for any high shoring or large bearing capacity projects.
High shoring and high bearing capacity
Built-in safe stopping device
Height adjustment with built-in indication tape
SGS certification in compliance with Australian Standard AS3610
Self-cleaning threading via cast steel screw nut
Powder coated finishing on outer tube
Made from aluminium alloy T6061-T6
Other related accessories are available such as truss frame bracing TMRK, prop connector, 1500*750mm panel formwork, etc.
Five models in below table:
Model | Min Length (mm) | Max Length (mm) | A (mm) | B (mm) | Prop Weight (kg) | Min~Max Load Capacity (kN) |
TMP120 | 800 | 1200 | 715 | 421 | 10.4 | 70~90 |
TMP250 | 1450 | 2500 | 1365 | 1071 | 15.5 | 60~70 |
TMP350 | 1980 | 3500 | 1865 | 1571 | 18.7 | 42~88 |
TMP480 | 2600 | 4800 | 2515 | 2221 | 23.8 | 25~85 |
TMP625 | 4300 | 6250 | 4211 | 1957 | 30.2 | 25~56 |
For high shoring or big load bearing capacity in buidling and civil engineering projects.
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.