< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON-Form Film Faced Plywood

SHARE:

TECON-Form Film Faced Plywood is a series of strong, flat and waterproof panels for contrution site shuttering purpose. They has wide range from polar, hardwood to birch and birch x-life with different veneer material, film, glue and manufacturing process. TECON-Form Film Faced Plywood is widely used in various formwork systems, from conventional formwork to H20 timber beam formwork as well as panel formwork etc..

Features of TECON-Form Film Faced Plywood

  • Different grade and reuse times option, from high end to low end, always meet your budget

  • Can produce smooth and flat conrete finishing

  • Easy to nail, saw and drill in order to suit different size and shape concrete structure

  • One worker is able to deliver a single piece of plywood by hand on site

  • Can act as versatile shuttering board for both horizontal and vertical structures



Specifications of TECON-Form Film Faced Plywood

  • Different plywood series can be used from 4 times to 30 times

  • Main sizes: 1220×2440mm / 1250*2500mm / 915*1830 mm

  • Customized sizes such as 3000×1000 mm, 2400×1000 mm, 1800*180mm etc.

  • Nominated thickness: 12/15/18/21 mm

  • Thickness tolerance: +/- 0.5 mm based on clients' requirement

  • Other specification including load bearing capacity data are available



Applications of TECON-Form Film Faced Plywood

     Widely used in different kind of projects where there is need for concrete shuttering.

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!