< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Protection Screen

SHARE:

TECON Protection Screen is a modular designed facade protection system which can climb automaticly via your high rise building by mobile hydraulic cylinder. It provides a maximum of three floors coverage with optional numbers of the platform. Therefore, it garantees a safe, efficient and weather-shielded working space for your site crews in hight position.

Features of Protection Screen

  • Independent self-climbing system saves crane usage during the whole construction phase

  • Full sealed facade protection ensures the safe operation condition of site crews

  • Customized storey heights and platform numbers meet different projects requirement

  • Embedded anchor system ensures firm attaching to the concrete structure

  • Universal utilization among different projects



Specifications of Protection Screen

  • Climbing device: Hydraulic cylinder

  • Climbing speed: 25 min/floor/unit

  • Platform width from the structure: 1 m

  • Platform quantity: 1~4 floors

  • Floor coverage height: 2.5 to 3.5 floors, 14 m height maximum

  • The degree of backwards, forwards, right and left tilting angle: ±10°

  • Load capacity of the platform during formwork operation and concrete maintenance is 0.75 kN/sqm

  • Standard unit size: 7 m with 2 pcs brackets



Applications of Protection Screen

     Façade protection and work platform for high rise building with regular shape layout


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!