< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Self-climbing Formwork TSC50 & TSC100

SHARE:

TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system lifted by hydraulic cylinders. It offers efficient and cost saving concreting solution for high-rise building, bridge pylons etc.. Up to 100kN lifting capacity and reliable embedded anchorage system ensures stable and safe automatic climbing with integrated formwork together.

Feature of Self-climbing Formwork SystemTSC50 & TSC100

  • This type of automatic climbing formwork system is efficient and easy to operate, thus without occupying tower crane schedule.   

  • This type of automatic climbing formwork system provides a safe and fully sealed operating platform that is not affected by the weather.

  • The reliable climbing bracket and embedded anchorage system of the self-climbing formwork have been proven effective on numerous project sites.                                  

  • The self climbing formwork can be shifted from one project to another, despite of different geometry.

  • The multi-platform design of the self-climbing formwork allows workers to operate at different levels.


Specification of Automatic Self-climbing Formwork TSC50 & TSC100

SpecificationDetails
Climbing ProcedureRail-guided, safe & stable without crane assistance
Main Platform Width2.4 / 2.7 m
Top Platform Width0.75 / 1.2 m
Bottom Platform Width1.2 m
Maximum Casting Height6 m
Effective Climbing Speed0.5 hour per floor
Climbing Incline±15° slope
Per Level Cycle (Including Tie Rebar)Around 7-10 days
Standard Bracket Height11 / 13 m
Standard Bracket Distance4 m
Platform Number4 / 5 floors
Hydraulic Cylinder Lifting Capacity50 / 100 kN


Application of Self-climbing Formwork TSC50 & TSC100

      Core wall of high-rise building, bridge pylon, tank, etc..


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!