< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Self-climbing Formwork TSC50 & TSC100

SHARE:

TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system lifted by hydraulic cylinders. It offers efficient and cost saving concreting solution for high-rise building, bridge pylons etc.. Up to 100kN lifting capacity and reliable embedded anchorage system ensures stable and safe automatic climbing with integrated formwork together.

Feature of Self-climbing Formwork TSC50 & TSC100

  • This type of automatic climbing formwork system is efficient and easy to operate, thus without occupying tower crane schedule.                                                                                               

  • Reliable climbing bracket and the embedded anchorage system of the self climbing formwork proven by lots project sites.

  • This type of automatic climbing formwork system provides a safe and fully sealed operating platform that is not affected by the weather.

  • The self climbing formwork  can be shifted from one project to another despite of different geometry.

  • Multi-Platforms design of the self climbing formwork allow workers operating on different level.



Specification of Self-climbing Formwork TSC50 & TSC100

  • Rail-guided, safe & stable climbing procedure without crane assistance

  • Main platform width: 2.4/2.7 m

  • Top platform width: 0.75/1.2 m

  • Bottom platform width: 1.2 m

  • Maximum casting height: 6 m 0.5 hour per floor effective climbing speed

  • Available climbing incline at ±15°slope

  • Per level cycle including tie rebar: around 7-10 day s

  • Standard bracket height: 11/13 m

  • Standard bracket distance: 4 m

  • The platform number: 4/5 floors

  • Hydraulic cylinder lifting capacity: 50/100 kN



Application of Self-climbing Formwork TSC50 & TSC100

      Core wall of high-rise building, bridge pylon, tank, etc..


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!