< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON HETO Frame Wall Formwork

SHARE:

TECON HETO Frame Wall Formwork is an universal and high efficient panel formwork system. It consists of S355 steel frame formwork panel, adjustable alignment clamp and panel strut ect.. It can be widely applied into medium to big size wall projects under crane asisstance.

HETO Frame Wall Formwork Features & Benefits

  • Fast & Simple Assembly – Uses a single panel coupler for quick installation, with just four clamps needed for two 3×1m panels.

  • Adaptable Design – Supports L, T, and U-shaped walls

  • Smooth Finish – Fewer visible holes and a high-quality concrete surface.

  • Long-Lasting & Cost-Effective – Durable materials ensure extended service life.

  • Easy Maintenance – Powder coating prevents concrete adhesion, simplifying cleaning.

  • Corrosion-resistant – Protects against rust and moisture.

  • Replaceable Plywood – High-quality birch plywood with up to 30 times for longevity and cost savings.


Specifications of HETO Frame Wall Formwork

System TypePanel Formwork
MaterialQ355 Steel Profile
DimensionsH Panel heights: 3.0, 2.4, 1.8, 1.2 m
Panel Widths: 1.0, 0.75, 0.6, 0.35 m
Panel Weight35 kg/sqm
Max Panel Size3*1 m
Panel Depth73 mm
Max Permissible Fresh Concrete Pressure60 kN/sqm
Installation Time100 m2
Formlining12 mm TECON-Form birch plywood
Connection TechnologyAdjustable Alignment Coupler with 135 mm range
Versatile ApplicationsIdeal for foundations, basements, high-rise buildings, swimming pools, retaining walls, tunnels, columns, and reconstruction projects.




Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!