TECON Alu-Flex Slab Formwork is one of the fastest early stripping decking system consists of 6082-T6 aluminium frame panel, early stripping head, truss bracing and shoring prop. Due to its portable panel and easy assembly sequence, workers can operate them efficiently without any crane assitance.
Easy and fast operation by hand thanks to the light weight panel and easy assembly sequence
Early stripping head reduces on-site material requirements and thus saves cost
Easy cleaning due to high-temperature powder coated frame
Wide application in various beamless slab project even for large area shuttering
Formwork panel is made from 6082-T6 aluminum alloy frame lined with 10mm TECON-Form birch plywood, the panel depth is 142mm
Panel length: 1800 / 1200 / 900 / 750 mm; Panel width: 1800 / 1200 / 900 / 750 / 600 mm
The Aluflex panel weights around 17.6 kg/sqm
Medium duty prop, D class or E class heavy duty prop following EN1065 standard as the shoring
For different slab thicknesses up to 700mm
Residential & commercial buildings with less beam design
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.