< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON Alu Flex Slab Formwork

SHARE:

TECON Alu-Flex Slab Formwork is one of the fastest early stripping decking system consists of 6082-T6 aluminium frame panel, early stripping head, truss bracing and shoring prop. Due to its portable panel and easy assembly sequence, workers can operate them efficiently without any crane assitance.

Features & Benefits
Specification
Projects
Contact

Features of Alu-Flex Slab Formwork

  • Easy and fast operation by hand thanks to the light weight panel and easy assembly sequence

  • Early stripping head reduces on-site material requirements and thus saves cost

  • Easy cleaning due to high-temperature powder coated frame

  • Wide application in various beamless slab project even for large area shuttering



Specification of Alu-Flex Slab Formwork

  • Formwork panel is made from 6082-T6 aluminum alloy frame lined with 10mm TECON-Form birch plywood, the panel depth is 142mm

  • Panel length: 1800 / 1200 / 900 / 750 mm; Panel width: 1800 / 1200 / 900 / 750 / 600 mm

  • The Aluflex panel weights around 17.6 kg/sqm

  • Medium duty prop, D class or E class heavy duty prop following EN1065 standard as the shoring

  • For different slab thicknesses up to 700mm



Application of Alu-Flex Slab Formwork

Residential & commercial buildings with less beam design

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry
Name*
Company*
Job Title
Email*
Phone*
Country*
Inquiry Type
Message/Comments*

Please provide details on the nature of your enquiry.

How did you hear about us?
Make an inquiry!