< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON HETO Frame Wall Formwork

SHARE:

TECON HETO Frame Wall Formwork is an universal and high efficient panel formwork system. It consists of S355 steel frame formwork panel, adjustable alignment clamp and panel strut ect.. It can be widely applied into medium to big size wall projects under crane asisstance.

Feature of HETO Frame Wall Formwork

  • Easy and simple connection via adjustable alignment clamp for all panel connections

  • Fast formwork erection output on site with only four panel widths

  • Small size H panel can be transported and assembled by hand

  • Long service life and easy to clean due to high-temperature powder coated or galvanized frame

  • Compact size in dimension saves cost and space in storage and transportation


Specifications of HETO Frame Wall Formwork

  • Formwork panel is made from S355 grade steel profile lined with 12mm TECON-Form birch plywood, the depth is only 73mm

  • Panel width is 1000mm, 750mm, 600mm and 250mm; Panel height is 3000mm, 2700mm, 1800mm and 1200mm

  • Multifuction HM panel weights around 45kg/sqm; H panel weights around 35kg/sqm

  • Alignment clamp is adjustable and easy to fasten, matches with timber filler joint up to 85mm width.

  • Max permissible fresh concrete pressure: 60 kN/sqm



Application of HETO Frame Formwork

Residential & commercial buildings with big area walls, infrastructure projects, adjustable columns and others.



Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!