TECON Slab Table Formwork is one of the most efficient slab shuttering solutions, especially for large area and multiple floors beamless structure. The system is consisted of TECON-Form plywood, H20 timber beam, table head, shoring prop etc. which can be pre-assembled into table unit on site. Big size Slab Table Formwork can be quickly moved into the next floor ready for pouring by crane lift.
Big shuttering area tables increase site efficiency greatly
Ready-to-use table units avoid repeated assembly and dismantle from every floor
Easy and fast to next position via trolley or tower crane
Fully compatible with other timber beam formwork with its H20 timber beam, plywood and steel props
The biggest table size can reach up to 4*6 m
Adapt with D class or E class heavy duty props for storey height less than 5.5 m
Adapt with TECON Heavy Duty Shoring Tower TST60 for storey height up to 20m maximum
Can form slab thicknesses up to 1000mm
Horizontal transportation by transporting trolley and vertical transportation from different floors by crane with lifting fork
Residential & commercial buildings, and factories with large area and multiple floors etc..
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.