< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Slab Table Formwork

SHARE:

TECON Slab Table Formwork is one of the most efficient slab shuttering solutions, especially for large area and multiple floors beamless structure. The system is consisted of TECON-Form plywood, H20 timber beam, table head, shoring prop etc. which can be pre-assembled into table unit on site. Big size Slab Table Formwork can be quickly moved into the next floor ready for pouring by crane lift.

Features of Slab Table Formwork

  • Big shuttering area tables increase site efficiency greatly

  • Ready-to-use table units avoid repeated assembly and dismantle from every floor

  • Easy and fast to next position via trolley or tower crane

  • Fully compatible with other timber beam formwork with its H20 timber beam, plywood and steel props



Specification of Slab Table Formwork

  • The biggest table size can reach up to 4*6 m

  • Adapt with D class or E class heavy duty props for storey height less than 5.5 m

  • Adapt with TECON Heavy Duty Shoring Tower TST60 for storey height up to 20m maximum

  • Can form slab thicknesses up to 1000mm

  • Horizontal transportation by transporting trolley and vertical transportation from different floors by crane with lifting fork



Application of Slab Table Formwork

Residential & commercial buildings, and factories with large area and multiple floors etc..


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!