TECON Adjustable HETO Frame Column Formwork

SHARE:

TECON Adjustable HETO Frame Column formwork is an adjustable column system that ensures high efficient assembly via crane assistance. It consists of S355 steel frame formwork panel, column coupler and panel strut ect.. Tens of column sizes can be easily formed by HM panels.

Feature of TECON Adjustable HETO Frame Column Formwork

  • Efficient assembly method and operations under crane assistance

  • Adjustable HM panel can meet all rectangle column sizes by 50mm increment

  • With the column clamp as the only component for all panel connections

  • With complete set of platform kits as well as tranporting wheels

  • Easy clean due to high-temperature powder coated frame


Specification of TECON Adjustable HETO Frame Column Formwork

  • Formwork panel is made from S355 grade steel profile lined with 12mm TECON-Form birch plywood, the depth is only 73mm

  • Panel width is 1000mm, 750mm, 600mm and 250mm; Panel height is 3000mm, 2700mm, 1800mm and 1200mm

  • Easy and fast column corner connection by column coupler

  • Max permissible fresh concrete pressure: 80 kN/sqm.


Application of TECON Adjustable HETO Frame Column Formwork

Various sizes columns in Residential & commercial buildings, infrastructure projects etc..

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.