< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON Single Side Wall Formwork

SHARE:

TECON single side formwork or SSF is a standard formwork supporting bracket system, which is specially designed for transferring fresh concrete side pressure to support frame and concrete foundations, and without any tie rod being pulled through the wall.


Features of Single Side Formwork

  • Standard frame brackets can be assembled simply and efficiently with crane assistance

  • Both standard and customized supporting frame heights are available

  • Adapt to different fresh concrete pressure by the different spacing of frames

  • Can be moved by workforce via its cast wheels

  • Fully compatible with all TECON wall formwork system



Specifications of Single Side Formwork

  • Operation platform with handrail at the top of the bracket

  • Main support frame sizes determine different wall heights

  • Up to 8 meters concrete casting height with a single cast

  • Height of the standard construction frame: 4.0 m

  • Height of extension frame A: 2.2 m

  • Height of extension frame B: 1.5 m

  • Can be braced by G.I. pipes and couplers as reinforcement between frames



Application of Single Side Formwork

     Single side walls in the metro station, sewage treatment plants, and other excavations projects



Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!