Multi-function Climbing Formwork MB180

SHARE:

TECON Multi-function Climbing Formwork MB180, is an advanced version of jump formwork with higher safety guarantee. It is also an economical version of self-climbing formwork with mobile hydraulic cylinder. Therefore, it can go up via both crane and hydraulic cylinder.

Features of Multi-function Climbing Formwork

  • Rail-guided bracket with climbing shoe maximizes the site safety

  • Each set of bracket and formwork will always go up through the climbing shoe fixed on the structure, which restricts big             movement from the air

  • Anti-falling hooks on the rail of bracket prevent possible accident of free drop, so every lift is safe even in windy area

  • Save crane time greatly by adding hydraulic cylinders and climbing kits to make them climb automatically



Specification of Multi-function Climbing Formwork

  • Multi-platforms design for more convenient and efficient work

  • Main platform width: 2.3 m

  • Maximum casting height: 4.5 m

  • Per level cycle including tie rebar: around 7-10 days

  • Standard bracket height: 12 m

  • Standard bracket distance: 4 m

  • The platform number: 4 floors



Application of Multi-function Climbing Formwork

      Core wall of high-rise building, bridge pylon, tank, etc..

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.