TECON Standard Tunnel form is a formwork system that allows the contractor to cast RCC walls and slabs in continuous pour and form a cell. It combines speed, quality, and accuracy with the flexibility and economy of in-situ construction.

Features of Tunnel Formwork

  • All-steel system provides durability and strength

  • Full perimeter platform system conform to Euro standard provides highest jobsite safety

  • TECON Standard Tunnel Form can easily be moved and stripped out by the help of Jack Screw and Wheels

  • Tunnel formwork required less slab cycle time due to that construction becomes fast and reliable which labour costs and mobilization costs on site

  • Reduced construction times which is up to 3 times faster than conventional



Application of Tunnel Formwork

TECON Standard Tunnel form is widely used in the construction of cellular structures with a high degree of repetition such as: Hotels, Apartments, Student Accommodation (Hostels), Private Housings, Commercial Developments and so on.


  • Plastic Formwork TP60

    Plastic Formwork TP60

    TECON Plastic formwork TP60 is recognized as the lightest formwork system due to its mediu...
  • Light Duty Prop

    Light Duty Prop

    TEP-B props are widely used where there asks for economic solution and no special requirem...
  • Trench Box

    Trench Box

    Trench Box is specially designed for edge support during trench excavation, mainly consist...
Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.