< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON Alu Flex Formwork

SHARE:

TECON Aluflex formwork is a very high efficient and light weight slab formwork which saves labor greatly without crane assistance. Due to very few components design, easy assembly sequence, and light weight aluminum panel, two workers are enough for formwork erection, with much higher output.

Features of Aluflex Slab Formwork

  •  Large-area shuttering

  •  Easy and fast operations

  •  Early stripping heads (drop heads) help to maximize the usage of aluminum panels, with themselves left in lower floor together with floor props

  •  Applicable with other formwork

  •  Improved safety measurements via support and protection in the structure edge

  • Complete birch plywood, and replaceable


Specification of Aluflex Slab Formwork

  • Biggest panel size 1.8*1.8m, weights 57.61kg and covers 3.24m2, it can bear slab thickness upto 200mm with 4 pcs props, and bear slab thickness upto 700mm with 5 pcs props.

  • Smallest panel size 0.9*0.6m, weights 15.29kg and covers 0.54m2, it can bear slab thickness upto 700mm with 4 pcs props.

  • Two workers are enough for the erection, stripping and removal of Alu-Flex formwork without tower crane. Panels weight around 20kg/m2. There are 12 kinds of panel sizes to meet different structure.

    image.png

Application of Aluflex Slab Formwork

Frame structure, such as slab-column structure, few beam structure ,Large-area slab standard, slab construction.


Related formwork of Aluflex Slab Formwork

Aludeck formwork

Table formwork

Flex20 formwork

HETO fram formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!