TECON Slab Flex 20 formwork is the most ideal and flexible solution not only for normal slab project but also for the most complicated slab plan with drop beams or narrow corners. Slab Flex 20 consists of TECON-Form plywood, H20 timber beam, shoring props etc. which can be freely arranged on their position and space.
Flexible, economic and ideal for all ground plans
Efficient assembly by manual operation
For all finishing requirements by free choice of shutters
Easy transportation and storage with minimized space
Can be applied to different beam shapes and sizes
Customized planning on specific project basis determines girder spacing as well as prop spacing
Free choice of shoring, with recommendation of D class or E class heavy duty props under EN1065 standard
For different slab thicknesses up to 1000 mm
Early dismantled system is available
Beam 20 Bracket and Beam 20 Extension with easy tighten system by D15 rod & nut
Slab & beam in various kind of buildings, factories, tanks and fly-over roads, bridges.
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.