< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON Plastic Round Column Formwork

SHARE:

TECON Round Column Formwork consists of plastic round column frame and steel round column frame in different diameters. Plastic circular column formwork is the lightest and economic round column formwork with diameter ranges from 300mm to 450mm with 50mm as increment. Steel round column formwork can be customzied in bigger diameters at any size.

Feature of TECON Plastic Round Column Formwork

  • The fastest way to make round columns whatever its plastic or steel

  • Easy and quick assembly by simply rotating the handles or fasten the bolts

  • Easy stacking with each other during transport and storage

  • Plastic round column formwork can be assembled by hand while steel round column formwork need crane assistance



Specification of TECON Plastic Round Column Formwork

  • Main material of plastic column panel is PP & fiber glass

  • Main material of steel column panel is 3mm to 6mm thick steel sheet

  • Main panel sizes of plastic is 750mm in height, and 300, 350, 400, 450mm in diameter

  • Main panel size of steel will follow your requirement from 200mm to 1200mm

  • Max permissible fresh concrete pressure: 80 kN/sqm



Application of TECON Plastic Round Column Formwork

Round columns in housing or commercial building projects.

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!