< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Climbing Formwork CB180/240

SHARE:

TECON Climbing Formwork CB180 & CB240 is a crane lifted climbing system. The climbing unit consists of formwork panel, climbing bracket, shaft platform beam and anchoring system. It can jump to the next pouring height for the core wall or external wall with the assistance of tower crane, and provides safe workplatform for both formwork panel and site workers.

Features of Climbing Formwork CB180/240

  • Time-saving moving procedure of the complete set to reach the next pouring height with only one crane lift

  • Offer speedy pouring cycle for the vertical structure

  • Provides 3-5 platforms for more convenient and efficient work

  • Reliable and high safety operation condition thanks to the anchor system

  • Compatible with TECON wall formwork system such as TECON Base 20 Wall Formwork HETO Frame Wall formwork and others



Specification of Climbing Formwork CB180/240

  • Main components: Climbing bracket, formwork, anchor system

  • Maximum one-time pouring height: 6 m

  • Standard bracket height: 11 m

  • The platform number: 3 to 5 floors

  • Standard unit size: 4 m with 2 pieces of bracket

  • The range of platform width: 1800~2400 mm

  • Main platform provides up to 2.4 m sufficient space for workers

  • Retraction of formwork panel up to 750 mm allows its cleaning on the shuttering


Application of Climbing Formwork CB180/240

High rise buildings, bridge piers, water tanks, LNG tanks and others.


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!