TECON Climbing Formwork CB180 & CB240 is a crane lifted climbing system. The climbing unit consists of formwork panel, climbing bracket, shaft platform beam and anchoring system. It can jump to the next pouring height for the core wall or external wall with the assistance of tower crane, and provides safe workplatform for both formwork panel and site workers.
Time-saving moving procedure of the complete set to reach the next pouring height with only one crane lift
Offer speedy pouring cycle for the vertical structure
Provides 3-5 platforms for more convenient and efficient work
Reliable and high safety operation condition thanks to the anchor system
Compatible with TECON wall formwork system such as TECON Base 20 Wall Formwork HETO Frame Wall formwork and others
Main components: Climbing bracket, formwork, anchor system
Maximum one-time pouring height: 6 m
Standard bracket height: 11 m
The platform number: 3 to 5 floors
Standard unit size: 4 m with 2 pieces of bracket
The range of platform width: 1800~2400 mm
Main platform provides up to 2.4 m sufficient space for workers
Retraction of formwork panel up to 750 mm allows its cleaning on the shuttering
High rise buildings, bridge piers, water tanks, LNG tanks and others.
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.