< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Climbing Formwork CB180/240

SHARE:

TECON Jumping Formwork CB180 & CB240 is a crane-lifted climbing system. The climbing unit consists of a formwork panel, climbing bracket, shaft platform beam and anchoring system. It can jump to the next pouring height for the core wall or external wall with the assistance of a tower crane and provides safe work platform for both the formwork panel and site workers.

Features of Crane Climbing Formwork CB180/240

  • Time-saving moving procedure of the complete set to reach the next pouring height with only one crane lift

  • Offer speedy pouring cycle for the vertical structure

  • Provides 3-5 platforms for more convenient and efficient work

  • Reliable and high safety operation condition thanks to the anchor system

  • Compatible with TECON wall formwork system such as TECON Base 20 Wall Formwork HETO Frame Wall formwork and others



Specification of Jumping Formwork System CB180/240

  • Main components: Climbing bracket, formwork, anchor system

  • Maximum one-time pouring height: 6 m

  • Standard bracket height: 11 m

  • The platform number: 3 to 5 floors

  • Standard unit size: 4 m with 2 pieces of bracket

  • The range of platform width: 1800~2400 mm

  • Main platform provides up to 2.4 m sufficient space for workers

  • Retraction of formwork panel up to 750 mm allows its cleaning on the shuttering


Application of Jumping Formwork System CB180/240

The climbing formwork system is used for high-rise buildings, bridge piers, water tanks, LNG tanks, and other structures.


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!