< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Dam Formwork DB180/240

SHARE:

TECON Dam formwork DB180 & DB240 is used for forming one-side conrete structure. It has high reliability and bearing capacity for mass concrete structures without tie rods to pull through. It is widely used for in dams, river power stations or navigation locks.

Features of Dam Formwork DB180/240

  • Can produce both single side inclined wall and double side inclined wall

  • High load capacity without tie rod to pull through concrete structure

  • Shorten crane time due to one unit design of dam formwork

  • Reliable anchorage system and muscular bracket strength ensure the highest on-site safety

  • Can be compatible with all TECON wall formwork system



Specification of Dam Formwork DB180/240

  • No tie rods are needed to pull through the wall

  • Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for a crane lift

  • Width of the formwork: 2.2/2.4

  • Maximum pouring height: 4 m

  • Available incline degree: ±45°

  • Distance of retrusion: 45 cm

  • Anchor point bearing capacity: 22 kN

  • Power unit: tower crane

  • Required crane lifting power: 30 kN/unit



Application of Dam Formwork DB180/240

One-sided construction projects such as dams, run-off river power stations and navigation locks.

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!