TECON Dam formwork DB180 & DB240 is used for forming one-side conrete structure. It has high reliability and bearing capacity for mass concrete structures without tie rods to pull through. It is widely used for in dams, river power stations or navigation locks.
Can produce both single side inclined wall and double side inclined wall
High load capacity without tie rod to pull through concrete structure
Shorten crane time due to one unit design of dam formwork
Reliable anchorage system and muscular bracket strength ensure the highest on-site safety
Can be compatible with all TECON wall formwork system
No tie rods are needed to pull through the wall
Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for a crane lift
Width of the formwork: 2.2/2.4
Maximum pouring height: 4 m
Available incline degree: ±45°
Distance of retrusion: 45 cm
Anchor point bearing capacity: 22 kN
Power unit: tower crane
Required crane lifting power: 30 kN/unit
One-sided construction projects such as dams, run-off river power stations and navigation locks.
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.